Ordering materials without a surplus you cannot return
Most DIY shortages happen because a project is not a perfect rectangle, or because cuts, breakage, and over-excavation were ignored. Each estimator on this page starts with a simple rectangle and then adds a waste percentage you can change. Ten percent is a reasonable default for many slabs, straight-lay floors, and simple roofs; complicated shapes deserve more.
Concrete is sold by the cubic yard (27 cubic feet). A 4-inch slab is one-third of a foot thick, so a 20-by-12-foot patio is a little under three cubic yards before waste. Bag estimates assume roughly 0.60 cubic feet for an 80-pound bag and 0.45 cubic feet for a 60-pound bag; check the bag in your store, because mix designs differ. Ready-mix is usually the practical choice above a small footing or post-hole project, and many plants have a minimum load.
Paint needs are wall area (and ceiling, if you include it) minus a rough allowance for doors and windows, multiplied by coats, then divided by label coverage. New drywall, dark color changes, and rough textures often need primer and extra product. Flooring should be ordered by the coverage you need after waste, not the exact room area; keep a carton for future repairs, because dye lots change. Roofing is measured in squares (100 square feet). Pitch increases the actual surface above the building footprint; this tool applies a uniform pitch factor to a single rectangle and cannot replace a takeoff on hips, valleys, and dormers.
Mulch is estimated in cubic yards and in 2-cubic-foot bags. Two to three inches is a common bed depth. Bulk delivery usually wins on price once the volume is more than about a yard, provided you can place the pile. For every project, confirm local code, permit, and structural questions — especially for roofs and load-bearing slabs — before you order.